The project concerns a new BRT line connecting the Fontivegge stop at the railway station, with the Castel del Piano terminus, located south of Perugia. The project is further complemented by six bike stations for modal interchange with the cycle network, as well as depot areas and office facilities, and three electrical substations to supply power to the depot area and the charging stations.
ETS carried out the final and construction design and safety coordination during the design stage.
ACTIVITY: BRT Line – Building infrastructure of the Pievaiola-Settevalli to Perugia corridor
PLACE: Perugia, Italy
CUSTOMER: Metaphora S.c.a r.l.
YEAR: 2023-ongoing
COST OF WORKS: € 75,168,818.01