The project concerns the construction of a new Switching Substation supplying the Cold Ironing systems at the Port of Taranto. The power supply is designed at high voltage (HV), making use of the existing infrastructure located in the immediate vicinity of the port area.
ETS carried out the technical and economic feasibility design study as well as the construction design.
ACTIVITY: “Cold Ironing” electrification of the quays at the Port of Taranto
PLACE: Taranto, Italia
CUSTOMER: AdSP del Mar Ionio
YEAR: 2024-ongoing
COST OF WORKS: € 33.667.788,62
Contact us for details about our services
