SIR2 PADOVA

ongoing

The project concerns the construction of the SIR2 tramway line, which is part of a wider system of mobility development in the Municipality of Padua. From 2021 the Network Intermediate System has become SMART – Sistema Metropolitano A Rete Tramviaria (Metropolitan Tramway Network System), comprising three lines that create a complete interconnected system.
ETS carried out the construction design and safety coordination during the design stage.

ACTIVITY: New SIR2 tramway line and Padua Smart System – Lot 1

PLACE: Padua, Italy

CUSTOMER: APS Holding S.p.A.

YEAR: 2023-ongoing

COST OF WORKS: €116,688,444.42

Contact us for details about our services

Contact Us