FLORENCE TRAMWAY

ongoing

The project concerns the construction of an inter-municipal system connecting Florence with the municipality of Campi Bisenzio, interfacing with Line 1 at Leopolda Station. Line 4 is divided into two additional sections: Line 4.1 Leopolda–Piagge and Line 4.2 Piagge–Campi Bisenzio.
ETS carried out the final design for Line 4.2 and the construction design for both sections.

ACTIVITY: Tramway line 4 Florence – Leopolda-Campi Bisenzio section

PLACE: Florence, Italy

CUSTOMER: Municipality of Florence

YEAR: 2023-ongoing

COST OF WORKS: € 353,404,956.11

Contact us for details about our services

Contact Us