The project concerns the resolution of interferences (clashes) between the Air Liquide Ø12″ pipeline in the Milan–Genoa section and the new Erzelli/Airport railway station, located between the Sestri Ponente and Cornigliano stations.
ETS carried out the construction design, as well as safety coordination during both the design and construction phases.
ACTIVITY: Interference resolution with work to Nodo di Genova (Genoa Junction). Genoa Airport connection – Railway Gate.
PLACE: Genoa, Italy
CUSTOMER: Air Liquide Italia Produzione S.r.l.
YEAR: 2022-2025
COST OF WORKS: € 900,000.00
Contact us for details about our services
